Study Detail

Current Maps

This page contains graphics of the preferred alternative that is identified in the Final Environmental Impact Statement (FEIS), which is tentatively scheduled to be made available to the public later this year. Build Alternative 3 was initially identified as the preferred alternative, after public and agency comments received on the 2013 Draft EIS were reviewed and considered. The Preferred Alternative has since been revised to reflect the most current projected traffic volumes as provided by the regional traffic model (see Revised Alternative 3 below).

The primary elements of Build Alternative 3 from the Draft EIS that remain in Revised Alternative 3 (preferred alternative) are:

The primary changes to the design of Alternative 3 that are reflected in Revised Alternative 3 reault in a reduced footprint and reduced environmental impacts. The design changes include:

The following are links to the plan sheets that appear in App C of the FEIS

R3-1 US 395 Connector System Interchange Area
R3-2 US 395 to Sun Valley Blvd
Queen Way to Disc Drive
R3-4 Disc Drive East of Pyramid Way
R3-5 Los Altos Parkway to Golden View Drive
R3-6 Sparks Blvd to Lazy Five Parkway
R3-7 Dolores Drive to La Posada Drive
R3-8 North of La Posada Drive
Revised Alternative 3 Figure

Overview of the Project Area
(click to enlarge)

Level 3 Pyramid Connector Overview Ridge 2014

Pyramid Connector Typical Section Overview 2014

Revised Alternative 3